After the teardown we were able to assess how much rust, panel damage and poor repairs the car had sustained from the previous panel shop. After the assessment, we determined that every panel with the exception of the roof needed to be replaced.
We started with the chassis first, replacing rusted out rails and fabricating new rails, installing the new floor, including torque boxes for strength. We fabricated new mini tubs to fit our HRE wheels and installed a new boot floor and firewall.